Nowadays, we want everything to go faster and it can!!
We developed the Cargo Floor Power Speed system for this that can, if required, unload the cargo of a 13.6 m semitrailer in approximately three minutes.
This sliding floor system is based on our standard CF500 SLC drive unit, but deviates regarding a few issues. You need:
- A larger pump: ≥ 180 l/minute
- Larger pipes
- More bolts to fasten the profile
- HD (heavy duty) cylinders
We also recommend providing the sliding floor system with the following profiles to guarantee a longer service life:
NOTE!
If you want to install this system in a semitrailer, you must take the semitrailer/frame structure into consideration: this must be able to withstand the higher dynamic forces.